Flat 32 Carlingford Rd, NW3

A second floor two bedroom flat that was refurbished in a construction time of nine weeks. Most of the flat was stripped out, and the kitchen and bathroom units were juxtaposed. The units were purchased in Italy and shipped to London

A second floor two bedroom flat that was refurbished in a construction time of nine weeks. Most of the flat was stripped out, and the kitchen and bathroom units were juxtaposed. The units were purchased in Italy and shipped to London