Flat 3 Frognal, NW3

A ground floor two bedroom flat that was refurbished in a construction time of nine weeks. Most of the flat was stripped out, and the kitchen and bathroom units were replaced. The units were purchased in Italy and shipped to London

A ground floor two bedroom flat that was refurbished in a construction time of nine weeks. Most of the flat was stripped out, and the kitchen and bathroom units were replaced. The units were purchased in Italy and shipped to London